Most
of the products we sell can
be installed in minutes using
basic household tools.
General
Installation Instructions
for Blinds & Shades.
Get acquainted with your blind
or shade components and terms
prior to installing. Treat
your blinds/shades with care
beginning with the unpacking.
Please DO NOT use scissors
or any other sharp tools while
unwrapping. The lift strings,
etc can be easily cut during
this step. Suggested tools
needed to complete installation
are: Pencil; Slotted or 1/4"
Nut Screw Driver; Hand or
electric drill; 3/32"
Bit; and Measuring Tape. Inside,
Outside or ceiling mount:
your blind has been produced
exactly to your specifications
to fit inside or outside your
window frame. Do not drill
holes into the mounting surface.
Screw the screws through the
bracket into the mounting
surface.
Place
the headrail of the blind
where you desire to mount
it. Care must be taken to
mount the headrail level.
This can be done by lowering
the headrail to clear any
obstructions. Once it is positioned
properly, pencil a reference
mark at each end of the headrail.
Mount
the end brackets. Each blind
comes with 2 brackets and
4 screws. Brackets are marked
left and right. On outside
or ceiling mounts, brackets
should be spaced an additional
1/4" on each side of
headrail. Place brackets at
the referencmark and mark
the screw holes with a pencil.
Select diagonal (right top
left bottom) holes to assure
a secure installation and
avoid splittingthe window
frame. Space center support
brackets evenly along the
width of the blind. Position
each bracket so that it will
not interfere with the hardware
inside the headrail. Line-up
the top of the center support
bracket with the top of the
end brackets, mark for screws.
Insert and tighten screws
throough all brackets. making
sure all brackets are straight
and level.
The
following should be done prior
to the final installation
of the blind. The valance
that is sent with all horizontal
blinds will be attached with
either of the following items;
Preattached hook and loop
tape (instructions to follow)
or with valance clips, that
will need to be attached to
the headrail at this point.
Next, if the tilter is a wand
and it was not preattached,
the wand should now be attached
to the tilter shaft.
Mount
the blind by sliding the headrail
into the brackets. Press the
front hinged cover plate until
it snaps in place.
To
install the valance If with
clips, insert the valnce into
the clips. If with the preattached
hook and loop, remove the
covering from the adhesive
strip and gently push the
valance against hook and loop
tape strips for adherence.
Note: Once hook and loop tape
is adhered it can not be removed.
If
hold down brackets were requested
they can be installed after
blind has been hung. Release
blind to full length and mark
each side of blind directly
across from hold down pin
in bottom rail. Make sure
that marks are placed at the
same level of the door/wall.
Place top of hold down bracket
at mark, screwthe brackets
to the mounting surface. Pull
blind down and slip the pins
into the brackets and bottom
rail.
|